Quantcast

The DNAinfo archives brought to you by WNYC.
Read the press release here.

tags

Chicago Department of Transportation

Recent Headlines
West Loop »

After two recent accidents, could a much-needed traffic signal be coming soon at Lake and Morgan?  

Ravenswood Manor »

The eight-week trial, which will divert traffic at Wilson Avenue, is set to start in mid-September.

The Loop »

Wabash will close between Madison and Monroe streets for 10 weeks, officials said.

West Loop »

A block-long stretch will be closed as crews perform emergency work and later reduced to one lane. 

Ravenswood Manor »

The proposed Manor Greenway would provide the missing link between Horner and Ronan parks.

Ravenswood Manor »

A plan to divert cars away from Ravenswood Manor raises questions about "cut-through" traffic.

University Village »

Crews are installing a new water main between Ashland Avenue and Halsted Street.

Lincoln Square »

The fencing signals the start of work on the Albany Park Stormwater Diversion Tunnel.

Lincoln Park »

Construction is expected to last about seven months, starting this month.

Downtown »

The ramp off Lake Shore Drive will be closed this month and after the NFL Draft. 

Lincoln Park »

The heavily used bridge will be closed for repairs for nearly three months.

Irving Park »

The bridge at Irving Park Road and the Chicago River is set for a much-needed reconstruction project.

Roscoe Village »

The planned Riverview Bridge was once known as the Addison Underbridge Connector.

Roscoe Village »

Following the weekend's full closure, traffic is moving on Western in both directions ahead of schedule.

Roscoe Village »

Little kids and grown-up kids who like seeing stuff demolished are in for a treat this weekend.