Quantcast

The DNAinfo archives brought to you by WNYC.
Read the press release here.

Upper Level of Verrazano-Narrows Bridge to Close at Night This Week

By Nicholas Rizzi | November 19, 2015 11:35am
 The MTA will close the upper level and the Belt Parkway approach ramps of the Verrazano-Narrows Bridge on Thursday and Friday night to install new steel on the bridge.
The MTA will close the upper level and the Belt Parkway approach ramps of the Verrazano-Narrows Bridge on Thursday and Friday night to install new steel on the bridge.
View Full Caption
DNAinfo/Nicholas Rizzi

FORT WADSWORTH — Sections of the upper level of the Verrazano-Narrows Bridge will close overnights on Thursday and Friday as part of the MTA's construction work.

On Thursday, the upper level of the Brooklyn-bound side of the bridge will close from from 9 p.m. to 5 a.m. and the Brooklyn-bound Belt Parkway exit ramp will close from 12:01 a.m. to 4 a.m. Friday as workers install new steel.

The work is part of the $84.3 million project to build a new bus/HOV ramp and reconstruct the bridge's Belt Parkway approach ramps, the MTA said.

Drivers who need the exit ramp to Belt Parkway will be detoured onto 92nd Street and eventually back to the highway, the MTA said.

The construction will be canceled if it rains, the MTA said.