Upper East Side & Roosevelt Island

Transportation

Roosevelt Island Bridge Closing for Maintenance on Friday

July 27, 2016 10:54am | Updated July 27, 2016 10:54am
Roosevelt Island Bridge will close intermittently on Friday.
View Full Caption
DNAinfo/Lindsay Armstrong

ROOSEVELT ISLAND — The Roosevelt Island Bridge will be closed on Friday for routine maintenance.

Starting at 10 a.m. through 2 p.m. on July 29, the bridge will be closed intermittently for 15 minutes at a time to test the bridge's lift system. Each time, the bridge will be completely closed, according to the Department of Transportation.

The bridge, which was opened in 1955, provides connection to motorists and pedestrians over the east channel of the East River to Astoria.

Advertisement